Swissôtel Project — Budva

Two high-rise towers under construction in Budva, served by a tower crane and a concrete pump boom.

On site: structural and masonry works — 2025–2026

Drone view at night: the hotel tower and the whole site under floodlights.Hotel tower in rough construction, with tower cranes on site and the Budva bay beyond.The podium from above: column reinforcement and formwork, with the hills above Budva behind.Night view over the tower and the lower blocks, a concrete pump at work and Budva lit up beyond.Straight down from the tower crane: beam and slab reinforcement with the crew at work.Red system formwork for the columns, with crews preparing the next pour.Setting out the partition walls: brick infill done, Ytong blocks ready, edge protection in place.A floor with its brick infill walls completed and the slab swept clean.Ytong partition built up to the slab, with a lintel over the door opening.Ytong corridor walls, straight and plumb, with the door openings formed.
Project type
Hotel and residential development
Location
Budva, Montenegro
Our role
Project management for the main contractor
Scope
Structural and masonry works

MATHIL d.o.o. was engaged by the main contractor to provide project management for the structural and masonry works, overseeing execution and coordination on site. Our responsibilities included site organization, coordination of construction teams, monitoring work progress, quality control, and ensuring that works were carried out in accordance with project requirements and the construction schedule.

Next projectPort of Royals — Luxury Villas, Kumbor

Have a project in Montenegro?

Tell us about the site, the stage you are at and what you need. We reply with a clear scope and a price.