Zum Hauptinhalt springen
MATHIL d.o.o.
Alle Projekte

02

Swissôtel-Projekt — Budva

Two high-rise towers under construction in Budva, served by a tower crane and a concrete pump boom.

Von der Baustelle: Rohbau und Mauerwerk — 2025–2026

Drone view at night: the hotel tower and the whole site under floodlights.Hotel tower in rough construction, with tower cranes on site and the Budva bay beyond.The podium from above: column reinforcement and formwork, with the hills above Budva behind.Night view over the tower and the lower blocks, a concrete pump at work and Budva lit up beyond.Straight down from the tower crane: beam and slab reinforcement with the crew at work.Red system formwork for the columns, with crews preparing the next pour.Setting out the partition walls: brick infill done, Ytong blocks ready, edge protection in place.A floor with its brick infill walls completed and the slab swept clean.Ytong partition built up to the slab, with a lintel over the door opening.Ytong corridor walls, straight and plumb, with the door openings formed.
Projektart
Hotel- und Wohnbauprojekt
Standort
Budva, Montenegro
Unsere Rolle
Projektmanagement für den Hauptauftragnehmer
Leistungsumfang
Rohbau- und Maurerarbeiten

MATHIL d.o.o. wurde vom Hauptauftragnehmer mit dem Projektmanagement für die Rohbau- und Maurerarbeiten beauftragt und verantwortete Ausführung und Koordination vor Ort. Zu unseren Aufgaben zählten Baustellenorganisation, Koordination der Baukolonnen, Fortschrittskontrolle, Qualitätssicherung und die Sicherstellung, dass die Arbeiten den Projektanforderungen und dem Bauzeitenplan entsprechen.

Nächstes ProjektPort of Royals — Luxusvillen, Kumbor

Sie haben ein Projekt in Montenegro?

Beschreiben Sie das Grundstück, Ihre aktuelle Phase und was Sie brauchen. Wir antworten mit klarem Leistungsumfang und Preis.

Angebot anfordern